Data Center Construction Manager
Posted on April 6, 2026 by Arayna Technology Solutions
- Santa Clara, United States of America
- $100000.0 - $150000.0
- fulltime, contract
Overview
We are seeking an experienced Construction Manager to oversee complex retrofit projects within hyperscale data centers. The ideal candidate will have a strong background in HVAC, electrical systems, and building management/control systems (BMS/EPMS) and must demonstrate an ability to manage construction activities in live, mission-critical environments with zero downtime tolerance.
Duties
- Manage day-to-day construction activities for HVAC, electrical, and BMS/control system retrofit projects within operating data centers.
- Coordinate and supervise subcontractors, vendors, and internal teams to ensure alignment with project scope, schedule, and budget.
- Collaborate with engineering, operations, commissioning agents, and hyperscaler client teams to ensure successful project delivery.
- Enforce and maintain rigorous safety, quality, and compliance standards.
- Review design drawings, submittals, MOPs (Methods of Procedure), and construction documents for constructability and alignment with project goals.
- Plan and execute work in operational environments with minimal to no disruption to live data center operations.
- Track project performance metrics, manage schedule updates, and report progress to internal and client stakeholders.
- Participate in commissioning, testing, and turnover of systems in accordance with hyperscaler standards and procedures.
- Manage change orders, RFI processes, and documentation requirements.
- Bachelor’s degree in Construction Management, Mechanical/Electrical Engineering, or related field (or equivalent work experience).
- 7+ years of experience in construction/project management, with 3+ years specifically in hyperscale or mission-critical data center environments.
- Proven expertise managing retrofit and upgrade projects involving HVAC systems, electrical infrastructure, and control systems (BMS/EPMS).
- Strong knowledge of data center MEP systems, including chilled water, CRAH/CRAC units, UPS, generators, switchgear, PDUs, and control integration.
- Experience managing live facility retrofits in high-availability environments without impacting critical operations.
- Understanding of industry standards such as ASHRAE, NEC, NFPA, and hyperscaler-specific design/construction guidelines.
- Familiarity with commissioning and QA/QC practices.
- Ability to interpret technical drawings, one-lines, control schematics, and network diagrams.
- Excellent communication, problem-solving, and leadership skills.
Preferred Qualifications:
- Prior experience working with hyperscaler clients (e.g., AWS, Google, Meta, Microsoft).
- PMP, LEED, or similar certification.
- OSHA 30 or equivalent safety training.
- Experience with project management software such as Procore, Primavera P6, or MS Project.
- Familiarity with BMS platforms such as Honeywell, Siemens, Tridium/Niagara, or Schneider EcoStruxure.
Job Types: Full-time, Contract
Pay: $100,000.00 - $150,000.00 per year
Benefits:
- 401(k)
- 401(k) matching
- Health insurance
- Paid time off
- Relocation assistance
- Vision insurance
Application Question(s):
- This position requires urgent hiring, how soon can you start?
Experience:
- Data Center Construction: 5 years (Preferred)
Ability to Commute:
- Santa Clara, CA 95055 (Required)
Ability to Relocate:
- Santa Clara, CA 95055: Relocate before starting work (Required)
Work Location: In person
Advertised until:
May 6, 2026
Are you Qualified for this Role?
Click Here to Tailor Your Resume to Match this Job
Share with Friends!
Similar Internships
No similar Intern Jobs at the Moment!