Floor Layer
Posted on Sept. 29, 2025 by ANR CONSTRUCTIONS
- Ancaster, Canada
- N/A
- Full Time
- Education:
- Expérience:
Education
- Secondary (high) school graduation certificate
Work setting
- Various locations
Tasks
- Inspect, measure and mark surfaces to be covered
- Measure, cut and fasten underlay and underpadding
- Measure, cut and install carpeting on floors
- Measure, cut and install resilient floor coverings
- Prepare and install hardwood floors
- Inspect and repair damaged floor coverings
- Prepare floors for installations
- Remove existing floor coverings and contaminants
- Install carpeting on walls or other surfaces
- Employ knee kickers and other equipment to stretch carpeting
- Perform direct glue-down carpet installations
- Perform double-bond carpet installations
- Install resilient stair components (special effects for the visually impaired)
- Install materials on counter tops and raised platforms
- Install vinyl decking materials
Work conditions and physical capabilities
- Physically demanding
- Bending, crouching, kneeling
Experience
- 1 to less than 7 months
Other benefits
- Team building opportunities
- Durée de l'emploi: Permanent
- Langue de travail: Anglais
- Heures de travail: 30 to 40 hours per week
Advertised until:
Oct. 29, 2025
Are you Qualified for this Role?
Click Here to Tailor Your Resume to Match this Job
Share with Friends!
Similar Internships
Floor layer
The Adecco Group is the largest human resources provider in the world and a Fortune 500 company, wh…
Floor Layer Assistant
You will be required to assist our Head Contractor in the installation of Hardwood, Engineered and …