FIND INTERNSHIPS

Floor Layer

Posted on Sept. 29, 2025 by ANR CONSTRUCTIONS

  • Full Time

Floor Layer
  • Education:
  • Expérience:
  • Education

  • Secondary (high) school graduation certificate
  • Work setting

  • Various locations
  • Tasks

  • Inspect, measure and mark surfaces to be covered
  • Measure, cut and fasten underlay and underpadding
  • Measure, cut and install carpeting on floors
  • Measure, cut and install resilient floor coverings
  • Prepare and install hardwood floors
  • Inspect and repair damaged floor coverings
  • Prepare floors for installations
  • Remove existing floor coverings and contaminants
  • Install carpeting on walls or other surfaces
  • Employ knee kickers and other equipment to stretch carpeting
  • Perform direct glue-down carpet installations
  • Perform double-bond carpet installations
  • Install resilient stair components (special effects for the visually impaired)
  • Install materials on counter tops and raised platforms
  • Install vinyl decking materials
  • Work conditions and physical capabilities

  • Physically demanding
  • Bending, crouching, kneeling
  • Experience

  • 1 to less than 7 months
  • Other benefits

  • Team building opportunities
  • Durée de l'emploi: Permanent
  • Langue de travail: Anglais
  • Heures de travail: 30 to 40 hours per week

Advertised until:
Oct. 29, 2025


Are you Qualified for this Role?


Click Here to Tailor Your Resume to Match this Job


Share with Friends!